Toolkit
  • Home
    • Academic Departments
      • ASTR
      • CHEM
      • EPS
      • EEB
      • MATH
      • MCDB
      • METX
      • OCEA
      • PHYS
    • Personnel
    • Communications
    • Computer Support
    • Curriculum Management
    • Divisional Accounting
    • Event & Award Support
    • Facilities Management
    • Philanthropy
    • Research Accounting
  • Message Center
  • Org Charts
  • Directory
Select Page

BIOMED – WORK ADVISORY – AUTOCLAVE REPLACEMENT – 01/12/26

Jan 5, 2026 | Biomedical Sciences Building, Facilities Management

LOCATION: Biomedical Sciences Building  WORK BEING PERFORMED: Autoclave replacement in BioMed 115C. SCHEDULED DATE: Monday, January 12, 2026 (Add this to your calendar) SCHEDULED TIME: 7:00 AM to 5:00 PM IMPACTS: You may hear and/or see workers in and around BioMed...

BIOMED – AREA CLOSURE – LOADING DOCK  – 01/12/26

Jan 5, 2026 | Biomedical Sciences Building, Facilities Management

LOCATION(S): BioMedical Sciences Building – Loading Dock  UTILITY TO BE SHUTDOWN: Loading Dock  SCHEDULED DATE: Monday, January 12, 2026 (add this to your calendar) SCHEDULED TIME: 7:00 AM to 5:00 PM REASON: Autoclave replacement project IMPACTS: The loading...

PSB – UTILITY SHUTDOWN – PASSENGER ELEVATOR – 01/05/26 – 01/12/26

Jan 5, 2026 | Facilities Management, Physical Sciences Building

LOCATION(S): Physical Sciences Building – Passenger Elevator (#75) SCHEDULED DATE(S): 2:10 PM on Monday, January 5, 2026 – 5:00 PM on Monday, January 12, 2026 REASON: Failed hydraulic cylinder packing DETAILS: We will continue to provide updates as we...

SINS – UTILITY SHUTDOWN – BUILDING HEATING & COOLING – 01/03 – 01/06/25

Jan 5, 2026 | Facilities Management, Sinsheimer Building

LOCATION(S): Sinsheimer Laboratories – South Wing UTILITY TO BE SHUT DOWN: Building heating and cooling system (ambient air temperature) SCHEDULED DATE(S): Saturday, January 3 to Tuesday, January 6, 2026 SCHEDULED TIME(S): 01/03/26 to 4 PM (estimated) on...

ISB – UTILITY SHUTDOWN – VENTILATION SYSTEM – 01/07/26

Dec 18, 2025 | Facilities Management, Interdisciplinary Sciences Building

LOCATION: Interdisciplinary Sciences Building UTILITY THAT WILL BE SHUT DOWN: Ventilation System SCHEDULED DATE(S): Wednesday, January 7, 2025 (Add this to your calendar) SCHEDULED TIME: 6:30 AM to 3:30 PM REASON: Preventive maintenance and air filter replacement. ...

THIM LABS – UTILITY SHUTDOWN – VENTILATION SYSTEM INCLUDING FUME HOODS – 01/08/26

Dec 18, 2025 | Facilities Management, Thimann Building

LOCATION: Thimann Labs UTILITY THAT WILL BE SHUT DOWN: Ventilation System — including Fume hoods SCHEDULED DATE(S): Thursday, January 8, 2026 (add this to your calendar) SCHEDULED TIME: 6:30 AM to 11:00 AM REASON: Preventive maintenance and air filter replacement....

Open Call: Allen Family Philanthropies – Accelerating Natural Climate Solutions

Dec 17, 2025 | Awards & Funding, Faculty

The Office of Foundation Relations is pleased to share this open call for funding from Allen Family Philanthropies.  UCSC Contact: Caroline Rodriguez | caroline@ucsc.edu Funder: Allen Family Philanthropies Opportunity: Accelerating Natural Climate Solutions in the...

Bridgeway Door to SINS 1st Not Unlocking-Door Propped

Dec 16, 2025 | Facilities Management, Sinsheimer Building, Thimann Building

Good Morning All, The bridgeway door leading into the first floor of SINS from the third floor of THIM will not unlock from the outside. The key lock is not functioning. We have a high priority work order in progress with the campus lock shop to get it fixed. Current...

STEINHART WAY – WORK ADVISORY – ROAD CLOSURE – 12/18/25

Dec 15, 2025 | All Division, Facilities Management

LOCATION(S): Steinhart Way, between Quarry Plaza and Kerr Road  * See attached map. WORK TO BE PERFORMED: Fire Hydrant Flow Testing SCHEDULED DATE(S): Thursday, December 18, 2025 (Add this to your calendar) SCHEDULED TIME: 6:30 AM to 1:00 PM IMPACTS: Steinhart Way...

ISB – WORK ADVISORY – ROOF WORK – 12/15 – 12/18/25

Dec 12, 2025 | Facilities Management, Interdisciplinary Sciences Building

LOCATION(S): Interdisciplinary Sciences Building Rooftop and Red Hill Road SCHEDULED DATE(S): Monday, December 15 to Thursday, December 18, 2025 (Add this to your calendar) SCHEDULED TIME: 8:00 AM TO 5:00 PM REASON: Concrete pours for topping slab/roof replacement....
Page 17 of 86« First«...10...1516171819...304050...»Last »
Back to the Message Center

Recent messages

  • New cultural-observances calendar for planning support
  • Building and Utility Shutdown – Multiple Facilities 8/26-9/18/2026
  • THIM GREENHOUSE – UTILITY SHUTDOWN – ELECTRICAL – 07/28/26
  • CAMPUS WIDE – STAGE 1 ALERT – POTENTIAL REDUCTION TO COOLING WATER SYSTEMS – 07/21/26
  • SINS – UTILITY SHUTDOWN – FIRE SPRINKLERS AND FLOW ALARMS – 07/21/26
Pantheon v1.0
For Faculty & Staff | Division of Physical & Biological Sciences | About Toolkit
Site feedback

Login with CruzID