Toolkit
  • Home
    • Academic Departments
      • ASTR
      • CHEM
      • EPS
      • EEB
      • MATH
      • MCDB
      • METX
      • OCEA
      • PHYS
    • Personnel
    • Communications
    • Computer Support
    • Curriculum Management
    • Divisional Accounting
    • Event & Award Support
    • Facilities Management
    • Philanthropy
    • Research Accounting
  • Message Center
  • Org Charts
  • Directory
Select Page

SINS LABS – UTILITY SHUT DOWN – DEIONIZED WATER – 09/30/25

Sep 26, 2025 | Facilities Management, Sinsheimer Building

LOCATION: Sinsheimer Labs: South Wing Labs 109, 206, 309, and 409 UTILITY TO BE SHUT DOWN: Deionized Water SCHEDULED DATE(S): Tuesday, September 30, 2025 (add this to your calendar) SCHEDULED TIME: 7:00 AM to 12:00 PM REASON: Replacing the deionized water shut-off...

**REVISED DATE** SINS LABS – WORK ADVISORY – DUCT CLEANING – 10/09/25

Sep 24, 2025 | Facilities Management, Sinsheimer Building

LOCATION: Sinsheimer Labs – Loading Dock and Labs 304, 306, and 311 WORK BEING PERFORMED: Duct cleaning in Sinsheimer 304, 306, and 311, Cleaning hoses will come through Sinsheimer Loading Dock up through the windows. A service vehicle will be parked at the...

SINS SOUTH EAST LABS – WORK ADVISORY – REDUCED SUPPLY AIRFLOW – 10/02 – 10/09/25

Sep 24, 2025 | Facilities Management, Sinsheimer Building

LOCATION(S): Sinsheimer Laboratories – South Wing, East Side, all floors ** Affected rooms: 104, 104A, 104B, 106, 106A, 109, 109A, 109B, 111, 111A, 204, 206, 206A, 304, 306, 406 WORK TO BE COMPLETED: Construction related to the ongoing HVAC & Mechanical...

SINS – UTILITY SHUTDOWN HEATING HOT WATER & CHILLED WATER – 10/08/25

Sep 24, 2025 | Facilities Management, Sinsheimer Building

LOCATION: Sinsheimer Laboratories – 304, 306, & 311 UTILITY TO BE SHUT DOWN: Heating Hot Water and Chilled Water SCHEDULED DATE: Wednesday, October 8, 2025 (add this to your calendar) SCHEDULED TIME: 7:00 AM to 5:00 PM  REASON: Installation of isolation...

**TOMORROW** NS2 – UTILITY TESTING – FIRE ALARM SYSTEM – 09/24/25

Sep 23, 2025 | Facilities Management, Natural Sciences 2 Building

LOCATION(S): Natural Sciences 2 – First Floor  UTILITY TO BE TESTED: Fire Alarm – Strobes HORNS MAY ALSO BE BRIEFLY SOUNDED – THIS IS LOUD! **If you hear an alarm, respond as you would to a regular alarm.** SCHEDULED DATE(S): Wednesday, September 24,...

Two Open Calls: Simons Foundation – Collaborations in Mathematics and the Physical Sciences – Simons Symposia

Sep 23, 2025 | Awards & Funding, Faculty

The Office of Foundation Relations is pleased to share these two open calls for funding from the Simons Foundation. UCSC Contact: Samantha Forde | forde@ucsc.edu Funder: Simons Foundation Opportunity: Collaborations in Mathematics and the Physical Sciences...

Open call: Spencer Foundation – Small Research Grants on Education

Sep 23, 2025 | Awards & Funding, Research

The Office of Foundation Relations is pleased to share this open call for funding from the Spencer Foundation. UCSC Contact: Caroline Rodriguez|caroline@ucsc.edu Funder: Spencer Foundation Opportunity: Small Research Grants on Education Funding Level: up to $50,000...

**EXTENDED** SINS LABS  – UTILITY SHUTDOWN – THIRD FLOOR RESTROOMS – 12/15/25 – 03/13/26

Sep 22, 2025 | Facilities Management, Sinsheimer Building

LOCATION(S): Sinsheimer Labs UTILITY TO BE SHUT DOWN: Third Floor Restrooms SCHEDULED DATE(S): Monday, October 20 through Friday, January 2, Monday, December 15, 2025 to Friday, February 20, March 13, 2026 (add this to your calendar) SCHEDULED TIME: All day, daily for...

CAMPUS WIDE – UTILITY TESTING – EMERGENCY & STANDBY GENERATORS – 10/05 – 10/31/25

Sep 22, 2025 | Facilities Management

LOCATION(S): Across Residential Campus, Westside Research Park, and Coastal Science Campus UTILITY TO BE TESTED: All Standby and Emergency Generators SCHEDULED DATE(S): Sunday, October 5 to Friday, October 31, 2025 (add this to your calendar) SCHEDULED TIME: 7:00 AM...

NS2 – WORK ADVISORY – ROOF REPLACEMENT – 09/29 – 11/17/25

Sep 18, 2025 | Facilities Management, Natural Sciences 2 Building

LOCATION(S): Natural Sciences 2 – Roof over Stairwells and Restrooms ** see attached map for specific areas of work, outlined in green SCHEDULED DATE(S): Monday, September 29 to Monday, November 11, 2025 (add this to your calendar) SCHEDULED TIME: 7:00 AM to...
Page 23 of 86« First«...10...2122232425...304050...»Last »
Back to the Message Center

Recent messages

  • New cultural-observances calendar for planning support
  • Building and Utility Shutdown – Multiple Facilities 8/26-9/18/2026
  • THIM GREENHOUSE – UTILITY SHUTDOWN – ELECTRICAL – 07/28/26
  • CAMPUS WIDE – STAGE 1 ALERT – POTENTIAL REDUCTION TO COOLING WATER SYSTEMS – 07/21/26
  • SINS – UTILITY SHUTDOWN – FIRE SPRINKLERS AND FLOW ALARMS – 07/21/26
Pantheon v1.0
For Faculty & Staff | Division of Physical & Biological Sciences | About Toolkit
Site feedback

Login with CruzID