Sep 2, 2025 | Awards & Funding, Faculty
The Office of Foundation Relations is pleased to share this open call for funding from the Gordon and Betty Moore Foundation. UCSC Contact: Samantha Forde | forde@ucsc.edu Funder: Gordon and Betty Moore Foundation Opportunity: 2026 Experimental Physics Investigators...
Sep 2, 2025 | Awards & Funding, Faculty
The Office of Foundations Relations is pleased to share these two open calls for funding from the Simons Foundation. UCSC Contact: Samantha Forde|forde@ucsc.edu Funder: Simons Foundation Programs: 1. Fellows in Mathematics – DUE October 1, 2025 2. Collaborations...
Aug 29, 2025 | Facilities Management, Physical Sciences Building
LOCATION: Physical Sciences Building UTILITY TO BE SHUT DOWN: Hot Water – includes heating, domestic, industrial, and process SCHEDULED DATE(S): Monday, September 15 to Friday, September 19, 2025 (add this to your calendar) SCHEDULED TIME: 7:00 AM 9/15 through...
Aug 28, 2025 | All Division, Facilities Management
LOCATION(S): Campus Wide – All PBSci Buildings UTILITY TO BE SHUT DOWN: Potential Reduction to building Cooling Water Systems Temperature adjustments that will impact building chillers, room air conditioning, and any equipment supported by processed cooling...
Aug 28, 2025 | Facilities Management, Sinsheimer Building
LOCATION: Sinsheimer Laboratories – South Wing, East Side, All Floors UTILITY TO BE SHUT DOWN: Heating Hot Water and Chilled Water SCHEDULED DATE: Thursday, September 4, 2025 (add this to your calendar) SCHEDULED TIME: 7:00 AM to 11:00 AM REASON: Installation...
Aug 28, 2025 | Facilities Management, Sinsheimer Building, Thimann Building
LOCATION: Thimann & Sinsheimer Labs – connecting bridge WORK BEING PERFORMED: Resurfacing of bridge/breezeway between Sinsheimer Labs’ first floor & Thimann Labs’ third floor SCHEDULED DATES: Monday, September 8 to Monday, September 15, 2025 (add this to...
Aug 25, 2025 | Facilities Management, Sinsheimer Building
LOCATION: Sinsheimer Labs – Loading Dock and Labs 204 & 206 WORK BEING PERFORMED: Duct cleaning in Sinsheimer 204 & 206, Cleaning hoses will come through Sinsheimer Loading Dock up through the windows. The work being performed for this Work Advisory...
Aug 22, 2025 | Facilities Management, Sinsheimer Building
LOCATION: Sinsheimer Laboratories – South Wing, All Floors UTILITY THAT WILL BE SHUT DOWN: Air Handling – Supply and Exhaust Air, including Fume Hoods. SCHEDULED DATE(S): Friday, September 5 to Sunday, September 7, 2025 (add this to your calendar) Note: this...
Aug 22, 2025 | Facilities Management, Sinsheimer Building
**The work being performed for this Work Advisory directly supports the large, ongoing Sinsheimer HVAC & Mechanical Controls Project currently underway in the SOUTH Wing Labs. For more information on this project, please see the related Toolkit Sinsheimer HVAC...
Aug 22, 2025 | Awards & Funding, Faculty
The Office of Foundation Relations is pleased to share two open calls for funding from the McKnight Foundation. UCSC Contact: Caroline Rodriguez | caroline@ucsc.edu| Funder: McKnight Foundation Opportunity 1: Neurobiology of Brain Disorders Award – DUE October...