Toolkit
  • Home
    • Academic Departments
      • ASTR
      • CHEM
      • EPS
      • EEB
      • MATH
      • MCDB
      • METX
      • OCEA
      • PHYS
    • Personnel
    • Communications
    • Computer Support
    • Curriculum Management
    • Divisional Accounting
    • Event & Award Support
    • Facilities Management
    • Philanthropy
    • Research Accounting
  • Message Center
  • Org Charts
  • Directory
Select Page

New cultural-observances calendar for planning support

Sep 1, 2026 | Divisional Announcements

Dear colleagues, The Science Division’s communications team has created a new Google Calendar called “Science Division Cultural Observances Calendar” that lists various religious and cultural observances. We kindly ask that you add it to your Google Calendar, and that...

Building and Utility Shutdown – Multiple Facilities 8/26-9/18/2026

Aug 7, 2026 | All Division, Facilities Management

UNIVERSITY OF CALIFORNIA, SANTA CRUZ BUILDING AND UTILITY SHUT DOWN – 1st NOTICE LOCATION(S): Multiple Facilities (see list below) UTILITIES THAT WILL BE SHUT DOWN: Natural Sciences 2 Main Building and Natural Sciences 2 Annex (CAANs 7179 & 7180) Entire...

THIM GREENHOUSE – UTILITY SHUTDOWN – ELECTRICAL – 07/28/26

Jul 20, 2026 | Facilities Management, Thimann Building

LOCATION: Thimann Laboratories, Fourth Floor (Greenhouses) ONLY UTILITY TO BE SHUT DOWN: Electrical SCHEDULED DATE: Tuesday, July 28, 2026 (add this to your calendar) SCHEDULED TIME: 7:00 PM to 11:00 AM REASON: Tying in electrical to the panel on the fourth floor....

CAMPUS WIDE – STAGE 1 ALERT – POTENTIAL REDUCTION TO COOLING WATER SYSTEMS – 07/21/26

Jul 20, 2026 | All Division, Facilities Management

LOCATION(S): Campus Wide – All PBSci Buildings UTILITY TO BE SHUT DOWN: Potential Reduction to building Cooling Water Systems Temperature adjustments that will impact building chillers, room air conditioning, and any equipment supported by processed cooling...

SINS – UTILITY SHUTDOWN – FIRE SPRINKLERS AND FLOW ALARMS – 07/21/26

Jul 17, 2026 | Facilities Management, Sinsheimer Building

LOCATION: Sinsheimer Labs UTILITY TO BE SHUT DOWN: Fire Sprinklers in South Wing, Fourth Floor Sprinkler Flow Alarms in ENTIRE BUILDING The work requiring this Utility Shutdown directly supports the ongoing Sinsheimer HVAC & Mechanical Controls Project currently...

SINS – UTILITY SHUTDOWN – HVAC INCLUDING FUME HOODS – 07/29 – 07/30/26

Jul 15, 2026 | Facilities Management, Sinsheimer Building

LOCATION(S): Sinsheimer Laboratories – Entire Building UTILITY THAT WILL BE SHUT DOWN: Ventilation System — including Fume hoods SCHEDULED DATES: North Labs: Wednesday, July 29, 2026 South Labs: Thursday, July 30, 2026 (add this shutdown to your calendar)...

CAMPUS WIDE – STAGE 1 ALERT – POTENTIAL REDUCTION TO COOLING WATER SYSTEMS – 07/14 – 07/15/26

Jul 13, 2026 | All Division, Facilities Management

LOCATION(S): Campus Wide – All PBSci Buildings UTILITY TO BE SHUT DOWN: Potential Reduction to building Cooling Water Systems Temperature adjustments that will impact building chillers, room air conditioning, and any equipment supported by processed cooling...

THIM – UTILITY SHUTDOWN – CHILLED WATER – 07/21 & 7/22/26

Jul 7, 2026 | Facilities Management, Thimann Building

LOCATION: Thimann Labs UTILITY TO BE SHUT DOWN: Chilled Water SCHEDULED DATE(S): Tuesday, July 21 and Wednesday, July 22, 2026 (add this shutdown to your calendar) SCHEDULED TIME: 7:00 AM on 7/21 to 12:00 PM on 7/22 REASON: Relocation of chilled water lines on roof...

**UNPLANNED** NS2 – UTILITY SHUTDOWN – COMPRESSED AIR SYSTEM – 07/06/26

Jul 6, 2026 | Facilities Management, Natural Sciences 2 Building

LOCATION(S): Natural Sciences 2 UTILITY TO BE SHUT DOWN: Compressed air system for the entire building. UPLANNED DATE(S): **TODAY** Monday, July 6, 2026 (add this to your calendar) EXPECTED SHUTDOWN TIMES: 9:00 AM – 1:00 PM (estimated) REASON: The air compressor...

ISB – EXTENDED WORK ADVISORY – LED LIGHTING REPLACEMENT PROJECT – 7/20 – 8/21/26

Jul 2, 2026 | Facilities Management, Interdisciplinary Sciences Building

LOCATION(S): Interdisciplinary Sciences Building WORK TO BE PERFORMED: Building-wide LED lighting upgrades, including light fixtures and switches in all spaces (including classrooms, offices, corridors, common areas, restrooms, and mechanical/equipment rooms)....
Page 1 of 8612345...102030...»Last »
Back to the Message Center

Recent messages

  • New cultural-observances calendar for planning support
  • Building and Utility Shutdown – Multiple Facilities 8/26-9/18/2026
  • THIM GREENHOUSE – UTILITY SHUTDOWN – ELECTRICAL – 07/28/26
  • CAMPUS WIDE – STAGE 1 ALERT – POTENTIAL REDUCTION TO COOLING WATER SYSTEMS – 07/21/26
  • SINS – UTILITY SHUTDOWN – FIRE SPRINKLERS AND FLOW ALARMS – 07/21/26
Pantheon v1.0
For Faculty & Staff | Division of Physical & Biological Sciences | About Toolkit
Site feedback

Login with CruzID