Toolkit
  • Home
    • Academic Departments
      • ASTR
      • CHEM
      • EPS
      • EEB
      • MATH
      • MCDB
      • METX
      • OCEA
      • PHYS
    • Personnel
    • Communications
    • Computer Support
    • Curriculum Management
    • Divisional Accounting
    • Event & Award Support
    • Facilities Management
    • Philanthropy
    • Research Accounting
  • Message Center
  • Org Charts
  • Directory
Select Page

BIOMED – SHUTDOWN NOTIFICATION – HVAC – 03/19/26

Mar 13, 2026 | Biomedical Sciences Building, Facilities Management

LOCATION: Biomedical Sciences Building – Floors 1 to 4 UTILITY AFFECTED: ALL HVAC systems  REASON: Heating water coil leak repairs for air handler 1 (AHU-1) SCHEDULED DATE: Thursday, March 19, 2026 (add this to your calendar) SCHEDULED TIME: 6:00 AM to 12:00 PM...

BIOMED – SHUTDOWN NOTIFICATION – HVAC/VENTILATION INCLUDING FUME HOODS  – 03/19/26

Mar 5, 2026 | Biomedical Sciences Building, Facilities Management

LOCATION: Biomedical Sciences Building UTILITY TO BE SHUT DOWN: Building Ventilation Systems, including Fume Hoods, Processed Cooling Water (connected to ice machines and any water-cooled equipment in rooms 164, 264, and 364). SCHEDULED DATE: Thursday, March 19, 2026...

BIOMED – UTILITY TESTING – FIRE SPRINKLER SYSTEMS – 03/2026

Feb 27, 2026 | Biomedical Sciences Building, Facilities Management

LOCATION(S): Biomedical Sciences Building  UTILITY TO INSPECTED & TESTED: Building Fire Sprinkler Systems and Flow Switches WORK TO BE PERFORMED: The Plumbing & Fire Alarm Shops will be performing the testing of the building Fire Sprinkler waterflow and tamper...

BIOMED – UTILITY SHUTDOWN – HVAC & FIRE ALARM SYSTEMS – 03/04/26

Feb 20, 2026 | Biomedical Sciences Building, Facilities Management

LOCATION: Biomedical Sciences Building UTILITY THAT WILL BE SHUTDOWN: Intermittent Shutdowns of Building Ventilation Systems, including Fume Hoods and Exhaust Fans.  Components of the Fire Alarm System will also be tested. ** Note:  Do not use Fume Hoods or Steam...

**CANCELLED** BIOMED – SHUTDOWN NOTIFICATION – HVAC/AIR HANDLER

Feb 9, 2026 | Biomedical Sciences Building, Facilities Management

LOCATION: Biomedical Sciences Building – Floors 1 to 4 UTILITY AFFECTED: Building Ventilation Systems including but not limited to: Fume Hoods, Vacuum System, Building Heating and Cooling. REASON: Heating water coil leak repairs for air handler 1 (AHU-1)...

BIOMED & PSB – SHUTDOWN NOTIFICATION – DI/RO WATER SYSTEMS – 02/17/26

Feb 3, 2026 | Biomedical Sciences Building, Facilities Management, Physical Sciences Building

LOCATION(S): Biomedical Sciences Building Physical Sciences Building  UTILITY TO BE SHUT DOWN: RO/DI Water SCHEDULED DATES: Tuesday, February 17, 2026 (add this to your calendar) SCHEDULED TIME: 10:30 AM to 12:30 PM REASON: Replacement of DI water conditioning...

MULTIPLE BUILDINGS  – UTILITY TESTING – FIRE DOORS – 02/17 – 02/20/26

Feb 2, 2026 | Biomedical Sciences Building, Earth & Marine Sciences Building, Facilities Management, Sinsheimer Building

LOCATION(S): BioMed – Room 201 Earth & Marine Sciences – 13 Doors Sinsheimer – Room 225 UTILITY TO BE TESTED: Accordion fire doors and fire alarm related controls **Horn will not be sounded. If you hear an alarm, respond as you would to a regular...

BIOMED – UTILITY TESTING – FIRE ALARM SYSTEM – 02/04 – 03/06/26

Jan 21, 2026 | Biomedical Sciences Building, Facilities Management

LOCATION(S): Biomedical Sciences Building  UTILITY TO BE TESTED: Fire Alarm System  SCHEDULED DATE(S): Wednesday, February 4 to Friday, March 6, 2026 (add this to your calendar)  *Testing, maintenance, and repairs will be ongoing during this time. No alarms will sound...

BIOMED – UTILITY SHUTDOWN – STEAM SYSTEM – 01/26 – 01/28/26 

Jan 16, 2026 | Biomedical Sciences Building, Facilities Management

LOCATION(s): Biomedical Sciences Building UTILITY AFFECTED: Steam System – Building Wide SCHEDULED DATES: Monday (night), January 26 to Wednesday, January 28, 2026 (add this to your calendar) SCHEDULED TIME: 6:00 AM to 3:30 PM (Except Monday, which will only be...

BIOMED – WORK ADVISORY – AUTOCLAVE REPLACEMENT – 01/12/26

Jan 5, 2026 | Biomedical Sciences Building, Facilities Management

LOCATION: Biomedical Sciences Building  WORK BEING PERFORMED: Autoclave replacement in BioMed 115C. SCHEDULED DATE: Monday, January 12, 2026 (Add this to your calendar) SCHEDULED TIME: 7:00 AM to 5:00 PM IMPACTS: You may hear and/or see workers in and around BioMed...
Page 1 of 612345...»Last »
Back to the Message Center

Recent messages

  • UTILITY SHUTDOWN – DOMESTIC H & C WATER  *** SINS RESTROOMS CLOSED – ALL FLOORS*** – TUESDAY 3/31/26
  • Open call: Schmidt Sciences – AI Interpretability
  • WORK ADVISORY – SCIENCE HILL/SURROUNDING AREAS – DRONE SURVEY WORK – **THIS THURSDAY – MARCH 26, 2026**
  • Open call: Coefficient Giving – Capacity building to address risks from transformative AI
  • Open call – Coefficient Giving – Effective Careers
Pantheon v1.0
For Faculty & Staff | Division of Physical & Biological Sciences | About Toolkit
Site feedback

Login with CruzID