May 4, 2026 | Biomedical Sciences Building, Facilities Management, Physical Sciences Building
To Biomedical Sciences and Physical Sciences Building Occupants: PPDO Plumbing and Alarm Shop technicians, along with an outside contractor, will be conducting State mandated building walk-throughs of Biomed and PSB to visually inspect the Fire Alarm System sprinkler...
Apr 22, 2026 | Biomedical Sciences Building, Facilities Management
LOCATION: Biomedical Sciences Building UTILITY TO BE SHUT DOWN: Industrial Hot Water SCHEDULED DATE(S): Friday, April 24, 2026 (add this to your calendar) SCHEDULED TIME: 7:30 AM to 11:00 AM REASON: Repairing a leak on the Industrial Heating water backflow device....
Apr 22, 2026 | Biomedical Sciences Building, Facilities Management
LOCATION(S): Biomedical Sciences Building – 2nd floor door, outside 200A WORK TO BE PERFORMED: Roll down fire door will be repaired and operated based on smoke detector trip simulation using fire alarm controls HORN WILL NOT BE SOUNDED SCHEDULED DATE(S):...
Apr 21, 2026 | Biomedical Sciences Building, Facilities Management
LOCATION: Biomedical Sciences Building UTILITY THAT WILL BE SHUTDOWN: Intermittent Shutdowns of Building Ventilation Systems, including Fume Hoods and Exhaust Fans. Components of the Fire Alarm System will also be tested. Note: Do not use Fume Hoods or Steam...
Apr 10, 2026 | Biomedical Sciences Building, Facilities Management
LOCATION: Biomedical Sciences Building UTILITY TO BE SHUT DOWN: Industrial Hot Water (IHW) SCHEDULED DATE(S): Tuesday, April 14, 2026 (add this to your calendar) SCHEDULED TIME: 7:30 AM to 12:00 PM REASON: Repairing a leak on the Industrial Heating Water backflow...
Apr 7, 2026 | Biomedical Sciences Building, Facilities Management, Physical Sciences Building
LOCATIONS: Biomedical Sciences Building – Basement and Second Floor McHenry Library – Basement through Fourth Floor Physical Sciences Building – Fifth Floor WORK TO BE COMPLETED: Roll Down Fire Doors will be repaired – doors will remain open...
Mar 13, 2026 | Biomedical Sciences Building, Facilities Management
LOCATION: Biomedical Sciences Building – Floors 1 to 4 UTILITY AFFECTED: ALL HVAC systems REASON: Heating water coil leak repairs for air handler 1 (AHU-1) SCHEDULED DATE: Thursday, March 19, 2026 (add this to your calendar) SCHEDULED TIME: 6:00 AM to 12:00 PM...
Mar 5, 2026 | Biomedical Sciences Building, Facilities Management
LOCATION: Biomedical Sciences Building UTILITY TO BE SHUT DOWN: Building Ventilation Systems, including Fume Hoods, Processed Cooling Water (connected to ice machines and any water-cooled equipment in rooms 164, 264, and 364). SCHEDULED DATE: Thursday, March 19, 2026...
Feb 27, 2026 | Biomedical Sciences Building, Facilities Management
LOCATION(S): Biomedical Sciences Building UTILITY TO INSPECTED & TESTED: Building Fire Sprinkler Systems and Flow Switches WORK TO BE PERFORMED: The Plumbing & Fire Alarm Shops will be performing the testing of the building Fire Sprinkler waterflow and tamper...
Feb 20, 2026 | Biomedical Sciences Building, Facilities Management
LOCATION: Biomedical Sciences Building UTILITY THAT WILL BE SHUTDOWN: Intermittent Shutdowns of Building Ventilation Systems, including Fume Hoods and Exhaust Fans. Components of the Fire Alarm System will also be tested. ** Note: Do not use Fume Hoods or Steam...