Toolkit
  • Home
    • Academic Departments
      • ASTR
      • CHEM
      • EPS
      • EEB
      • MATH
      • MCDB
      • METX
      • OCEA
      • PHYS
    • Personnel
    • Communications
    • Computer Support
    • Curriculum Management
    • Divisional Accounting
    • Event & Award Support
    • Facilities Management
    • Philanthropy
    • Research Accounting
  • Message Center
  • Org Charts
  • Directory
Select Page

BIOMED & PSB – UTILITY INSPECTION – FIRE SPRINKLER SYSTEM INSPECTIONS – 05/18 – 06/05/26 & 06/16 – 07/31/26

May 4, 2026 | Biomedical Sciences Building, Facilities Management, Physical Sciences Building

To Biomedical Sciences and Physical Sciences Building Occupants: PPDO Plumbing and Alarm Shop technicians, along with an outside contractor, will be conducting State mandated building walk-throughs of Biomed and PSB to visually inspect the Fire Alarm System sprinkler...

BIOMED – UTILITY SHUTDOWN – INDUSTRIAL HOT WATER – 04/24/26

Apr 22, 2026 | Biomedical Sciences Building, Facilities Management

LOCATION: Biomedical Sciences Building UTILITY TO BE SHUT DOWN: Industrial Hot Water SCHEDULED DATE(S): Friday, April 24, 2026 (add this to your calendar) SCHEDULED TIME: 7:30 AM to 11:00 AM REASON: Repairing a leak on the Industrial Heating water backflow device....

BIOMED – WORK ADVISORY – ROLL DOWN FIRE DOOR – 05/04 – 05/05/26

Apr 22, 2026 | Biomedical Sciences Building, Facilities Management

LOCATION(S): Biomedical Sciences Building – 2nd floor door, outside 200A WORK TO BE PERFORMED: Roll down fire door will be repaired and operated based on smoke detector trip simulation using fire alarm controls HORN WILL NOT BE SOUNDED  SCHEDULED DATE(S):...

BIOMED – UTILITY SHUTDOWN – HVAC & FIRE ALARM SYSTEMS – 04/29/26

Apr 21, 2026 | Biomedical Sciences Building, Facilities Management

LOCATION: Biomedical Sciences Building UTILITY THAT WILL BE SHUTDOWN: Intermittent Shutdowns of Building Ventilation Systems, including Fume Hoods and Exhaust Fans.  Components of the Fire Alarm System will also be tested. Note:  Do not use Fume Hoods or Steam...

BIOMED – UTILITY SHUTDOWN – INDUSTRIAL HOT WATER – 04/14/26

Apr 10, 2026 | Biomedical Sciences Building, Facilities Management

LOCATION: Biomedical Sciences Building UTILITY TO BE SHUT DOWN: Industrial Hot Water (IHW) SCHEDULED DATE(S): Tuesday, April 14, 2026 (add this to your calendar) SCHEDULED TIME: 7:30 AM to 12:00 PM REASON: Repairing a leak on the Industrial Heating Water backflow...

VARIOUS BUILDINGS – WORK ADVISORY – ELEVATOR DOOR SMOKE CURTAIN – 04/21 – 04/22/26

Apr 7, 2026 | Biomedical Sciences Building, Facilities Management, Physical Sciences Building

LOCATIONS: Biomedical Sciences Building – Basement and Second Floor McHenry Library – Basement through Fourth Floor Physical Sciences Building – Fifth Floor WORK TO BE COMPLETED: Roll Down Fire Doors will be repaired – doors will remain open...

BIOMED – SHUTDOWN NOTIFICATION – HVAC – 03/19/26

Mar 13, 2026 | Biomedical Sciences Building, Facilities Management

LOCATION: Biomedical Sciences Building – Floors 1 to 4 UTILITY AFFECTED: ALL HVAC systems  REASON: Heating water coil leak repairs for air handler 1 (AHU-1) SCHEDULED DATE: Thursday, March 19, 2026 (add this to your calendar) SCHEDULED TIME: 6:00 AM to 12:00 PM...

BIOMED – SHUTDOWN NOTIFICATION – HVAC/VENTILATION INCLUDING FUME HOODS  – 03/19/26

Mar 5, 2026 | Biomedical Sciences Building, Facilities Management

LOCATION: Biomedical Sciences Building UTILITY TO BE SHUT DOWN: Building Ventilation Systems, including Fume Hoods, Processed Cooling Water (connected to ice machines and any water-cooled equipment in rooms 164, 264, and 364). SCHEDULED DATE: Thursday, March 19, 2026...

BIOMED – UTILITY TESTING – FIRE SPRINKLER SYSTEMS – 03/2026

Feb 27, 2026 | Biomedical Sciences Building, Facilities Management

LOCATION(S): Biomedical Sciences Building  UTILITY TO INSPECTED & TESTED: Building Fire Sprinkler Systems and Flow Switches WORK TO BE PERFORMED: The Plumbing & Fire Alarm Shops will be performing the testing of the building Fire Sprinkler waterflow and tamper...

BIOMED – UTILITY SHUTDOWN – HVAC & FIRE ALARM SYSTEMS – 03/04/26

Feb 20, 2026 | Biomedical Sciences Building, Facilities Management

LOCATION: Biomedical Sciences Building UTILITY THAT WILL BE SHUTDOWN: Intermittent Shutdowns of Building Ventilation Systems, including Fume Hoods and Exhaust Fans.  Components of the Fire Alarm System will also be tested. ** Note:  Do not use Fume Hoods or Steam...
Page 1 of 612345...»Last »
Back to the Message Center

Recent messages

  • Open call: Simons Foundation – SFARI New Ideas
  • Open Call: Simons Foundation – Simons Graduate Fellowships in Ecology and Evolution
  • Open call: Robert Wood Johnson Foundation – Health Equity Research That Meets This Moment
  • Open call: Michelson 20MM Foundation – 2026 Student Basic Needs Spark Grants
  • Open call: Carnegie Corporation of NY – Grants to Support Reducing Nuclear Dangers
Pantheon v1.0
For Faculty & Staff | Division of Physical & Biological Sciences | About Toolkit
Site feedback

Login with CruzID