Aug 14, 2025 | Coastal Biology Building, Facilities Management
LOCATION: Coastal Biology Building (CBB) and CSC Greenhouse EVENT: Annual lockdown test conducted by ITS Physical Security SCHEDULED DATE: Monday, August 18, 2025 SCHEDULED TIME: 6:00 AM to approximately 6:45–7:00 AM REASON: To verify that the lockdown response system...
Aug 7, 2025 | Coastal Biology Building, Facilities Management
LOCATION: Coastal Biology Building, Headhouse & Greenhouse Buildings, CSC Core Building, CSC Auxiliary Building UTILITY THAT WILL BE SHUT DOWN: Building Ventilation and Mechanical Systems including but not limited to: Fume Hoods, Processed Cooling Water (connected...
Apr 21, 2025 | Biomedical Sciences Building, Center for Adaptive Optics, Coastal Biology Building, Facilities Management, Interdisciplinary Sciences Building, Physical Sciences Building
***Horns will NOT be sounded*** LOCATIONS: Biomedical Sciences Building – Passenger Elevators (2) Center for Adaptive Optics – Passenger Elevator Coastal Biology Building – Passenger Elevators (2) Core West Parking Garage – Passenger Elevators...
Feb 28, 2025 | Coastal Biology Building, Facilities Management
LOCATIONS: South Science Complex – Coastal Biology Campus and Long Marine Lab Complex (including Ocean Health, Seymour Center, Doyle, and Younger) UTILITY TO BE TESTED: Fire Alarm – HORNS WILL BE SOUNDED — THIS IS LOUD! **If you do hear an alarm, respond...
Feb 6, 2025 | Coastal Biology Building, Facilities Management
LOCATION: Coastal Biology Building, Headhouse & Greenhouse Buildings, CSC Core Building, CSC Auxiliary Building UTILITY THAT WILL BE SHUT DOWN: Building Ventilation and Mechanical Systems including but not limited to: Fume Hoods, Processed Cooling Water (connected...
Nov 27, 2024 | Coastal Biology Building, Facilities Management
LOCATION(S): Coastal Biology Building UTILITY TO INSPECTED & TESTED: Building Fire Sprinkler Systems and Flow Switches WORK TO BE PERFORMED: The Plumbing & Fire Alarm Shops will be performing the testing of the building Fire Sprinkler waterflow and tamper...
Sep 10, 2024 | Coastal Biology Building, Facilities Management
LOCATION(S): Coastal Science Campus (map) WORK TO BE PERFORMED: Repair of concrete aprons around manholes SCHEDULED DATE(S): Thursday, September 12 through Monday, September 30, 2024 (add this to your calendar) SCHEDULED TIME: 6:00 AM TO 4:00 PM REASON: Maintaining...
Sep 10, 2024 | Coastal Biology Building, Facilities Management
LOCATION(S): McAllister Way * See attached traffic map. WORK TO BE PERFORMED: Utility locating along McAllister Way – a contractor will be doing one way traffic control at the location on the map. SCHEDULED DATE(S): Monday, September 16, 2024 (add this to your...
Mar 13, 2024 | Coastal Biology Building, Facilities Management
LOCATIONS: Coastal Biology Building and South Science Complex (including Long Marine Lab, Ocean Health Building, and Seymour Center) UTILITY TO BE TESTED: Fire Alarm – HORNS WILL BE SOUNDED — THIS IS LOUD! **If you do hear an alarm, respond as you would to a...
Feb 27, 2024 | Center for Adaptive Optics, Coastal Biology Building, Facilities Management, Interdisciplinary Sciences Building
***Horns will NOT be sounded*** LOCATIONS: Center for Adaptive Optics (passenger elevator), Interdisciplinary Sciences (passenger elevator), Coastal biology (two passenger elevators), and Westside Research Park (passenger and freight elevators) Buildings UTILITY TO BE...