Toolkit
  • Home
    • Academic Departments
      • ASTR
      • CHEM
      • EPS
      • EEB
      • MATH
      • MCDB
      • METX
      • OCEA
      • PHYS
    • Personnel
    • Communications
    • Computer Support
    • Curriculum Management
    • Divisional Accounting
    • Event & Award Support
    • Facilities Management
    • Philanthropy
    • Research Accounting
  • Message Center
  • Org Charts
  • Directory
Select Page

HIGH IMPACT WORK ADVISORY – ROOF WORK AND AIR-HANDLING REPLACEMENT PROJECT – PSB – 6/7/21 THROUGH 6/11/21

May 19, 2021 | Facilities Management, Physical Sciences Building

WORK TO BE PERFORMED:  The heating and cooling coils located within the PSB rooftop air handler units are being replaced, and new fans are being installed. Other maintenance needs are being addressed concurrent with this shutdown to minimize future...

PSB – HVAC UTILITY SHUTDOWN – 3/11/21

Feb 26, 2021 | Facilities Management, Physical Sciences Building

LOCATION(S): Physical Sciences Building UTILITY TO BE SHUT DOWN: Building Ventilation and Mechanical Systems- including Fume Hoods, Processed Cooling Water & DI/RO Water SCHEDULED DATE: Thursday, March 11, 2021 SCHEDULED TIME: 6:00 AM  – 11:00 AM REASON:...
Page 5 of 5«12345
Back to the Message Center

Recent messages

  • PSB – UTILITY SHUTDOWN – FREIGHT ELEVATOR – 01/08/26 – TBD
  • BIOMED – WORK ADVISORY – AUTOCLAVE REPLACEMENT – 01/12/26
  • BIOMED – AREA CLOSURE – LOADING DOCK  – 01/12/26
  • PSB – UTILITY SHUTDOWN – PASSENGER ELEVATOR – 01/05/26 – TBD
  • SINS – UTILITY SHUTDOWN – BUILDING HEATING & COOLING – 01/03 – 01/06/25
Pantheon v1.0
For Faculty & Staff | Division of Physical & Biological Sciences | About Toolkit
Site feedback

Login with CruzID