SINS – WORK ADVISORY – BREAKROOM RENOVATION – 02/14 – 02/27/26

Feb 10, 2026 | Facilities Management, Sinsheimer Building

LOCATION: Sinsheimer Laboratories – Room 352 (Breakroom) WORK TO BE COMPLETED: Demolition/Renovation of Sinsheimer 352 SCHEDULED DATE: Saturday, February 14 to Friday, February 27, 2026 (add this to your calendar) SCHEDULED TIME: All times during scheduled dates...

SINS – UTILITY SHUTDOWN – DOMESTIC COLD WATER – 02/10/26

Feb 4, 2026 | Facilities Management, Sinsheimer Building

LOCATION: Sinsheimer Labs: Restrooms, all floors UTILITY TO BE SHUT DOWN: Domestic Cold Water to restrooms SCHEDULED DATE: Tuesday, February 4, 2026 (add this to your calendar) SCHEDULED TIME: 7:00 AM to 12:00 PM  REASON: Replacing hose bibbs in the renovated third...

MULTIPLE BUILDINGS  – UTILITY TESTING – FIRE DOORS – 02/17 – 02/20/26

Feb 2, 2026 | Biomedical Sciences Building, Earth & Marine Sciences Building, Facilities Management, Sinsheimer Building

LOCATION(S): BioMed – Room 201 Earth & Marine Sciences – 13 Doors Sinsheimer – Room 225 UTILITY TO BE TESTED: Accordion fire doors and fire alarm related controls **Horn will not be sounded. If you hear an alarm, respond as you would to a regular...

SINS – SHUTDOWN NOTIFICATION – FIRE SPRINKLER SYSTEM – 02/05/2026

Jan 29, 2026 | Facilities Management, Sinsheimer Building

LOCATION(S): Sinsheimer Labs – First Floor, South Wing ONLY  UTILITY TO BE SHUTDOWN: Fire Sprinklers and Sprinkler Flow Alarm *During this work, if you do hear an alarm, respond as you would to a regular fire alarm.  SCHEDULED DATE(S): Thursday, February 5, 2025...

SINS LABS – UTILITY SHUT DOWN – DEIONIZED WATER – 02/03/26

Jan 23, 2026 | Facilities Management, Sinsheimer Building

LOCATION: Sinsheimer Labs: South Wing Labs 109, 206, 309/311, and 409 UTILITY TO BE SHUT DOWN: Deionized Water SCHEDULED DATE(S): Tuesday, February 3, 2026 (add this to your calendar) SCHEDULED TIME: 7:00 AM to 12:00 PM REASON: Replacing the deionized water shut-off...

UPDATE UTILITY RESTORED SINS Restrooms Shutdown 1/20/26

Jan 20, 2026 | Facilities Management, Sinsheimer Building

UPDATE: Service has been restored to all restrooms except the third floor restrooms which are closed for construction LOCATION: Sinsheimer Labs: Restrooms, all floors UTILITY TO BE SHUT DOWN: Domestic Cold and Hot Water to Restrooms SCHEDULED DATE: Tuesday, January...

SINS – UTILITY SHUTDOWN – HEATING HOT WATER & CHILLED WATER – 01/21/25

Jan 15, 2026 | Facilities Management, Sinsheimer Building

UTILITY TO BE SHUT DOWN/LOCATION/SCHEDULED TIME: Chilled Water to Sinsheimer Labs 212B, 213, 213A, 214, 215, 312B, 312C, 313, 314, 315: 7:00 AM – 11:00 AM Heating Hot Water to Sinsheimer Labs 206, 409: 11:00 AM – 3:00 PM  The work requiring this Utility Shutdown...

SINS – UTILITY SHUTDOWN – ALL RESTROOMS – 01/20/26

Jan 14, 2026 | Facilities Management, Sinsheimer Building

LOCATION: Sinsheimer Labs: Restrooms, all floors UTILITY TO BE SHUT DOWN: Domestic Cold and Hot Water to Restrooms SCHEDULED DATE: Tuesday, January 20, 2026 (add this to your calendar) SCHEDULED TIME: 7:00 AM to 5:00 PM  REASON: Replacement of water valves in third...

SINS LABS – UTILITY SHUTDOWN – HVAC INCLUDING FUME HOODS – 01/28 – 01/29/26

Jan 14, 2026 | Facilities Management, Sinsheimer Building

LOCATION: Sinsheimer Labs – North & South UTILITY THAT WILL BE SHUT DOWN: Ventilation System — including Fume hoods SCHEDULED DATE: North: Wednesday, January 28, 2022 South: Thursday, January 29, 2022 (add this to your calendar) SCHEDULED TIME: 6:30 AM to...

SINSHEIMER LABS – WORK ADVISORY – DUCT CLEANING – 01/20 – 01/21/26

Jan 13, 2026 | Facilities Management, Sinsheimer Building

LOCATION: Sinsheimer Labs – Loading Dock and Labs 106A, 109, 109A, 109B, 111, 112, 112A, 112B, 113, 114, 115. WORK BEING PERFORMED: Duct cleaning in Sinsheimer 106A, 109, 109A, 109B, 111, 112, 112A, 112B, 113, 114, & 115, Cleaning hoses will come through...
Page 1 of 712345...»Last »
Back to the Message Center

Recent messages

  • NS2 – UTILITY SHUTDOWN – VENTILATION SYSTEM INCLUDING FUME HOODS – 02/26/26
  • **STARTING TODAY** ISB – WORK ADVISORY – BUILDING WINDOW CLEANING – 02/18 – 03/11/26
  • Announcing Limited Submission: FFAR – 2026 New Innovator in Food and Agriculture Research Award
  • Two open calls: American Chemical Society – New Direction (ND) and Doctoral New Investigator (DNI) Grants
  • Open call: Brain and Behavior Research Foundation – 2026 BBRF Young Investigator Grant
Pantheon v1.0
For Faculty & Staff | Division of Physical & Biological Sciences | About Toolkit
Site feedback

Login with CruzID