Toolkit
  • Home
    • Academic Departments
      • ASTR
      • CHEM
      • EPS
      • EEB
      • MATH
      • MCDB
      • METX
      • OCEA
      • PHYS
    • Personnel
    • Communications
    • Computer Support
    • Curriculum Management
    • Divisional Accounting
    • Event & Award Support
    • Facilities Management
    • Philanthropy
    • Research Accounting
  • Message Center
  • Org Charts
  • Directory
Select Page

SINS SOUTH LABS – UTILITY SHUTDOWN – HVAC INCLUDING FUME HOODS – 03/24 – 03/25/26

Mar 10, 2026 | Facilities Management, Sinsheimer Building

LOCATION(S): Sinsheimer Laboratories – South Wing UTILITY THAT WILL BE SHUT DOWN: All HVAC/Ventilation System — including fume hoods, supply air, exhaust air, fume hoods, and space temperature control. **PLEASE ENSURE THAT FUME HOOD SASHES ARE CLOSED The work...

SINS-RESTROOMS EMERGENCY SHUTDOWN 3/10/26

Mar 10, 2026 | Facilities Management, Sinsheimer Building

PBSci Facilities Notification SINS – EMERGENCY SHUTDOWN – All Restrooms 3/10/2026 LOCATION(S): Sinshiemer, All Floors UTILITY TO BE SHUT DOWN: All Restrooms SCHEDULED DATE(S): Tuesday 3/10/2026-TBD SCHEDULED TIME: All Day- Restoration time TBD at this...

SINS RESTROOMS – UTILITY SHUTDOWN – DOMESTIC WATER – 03/10/26

Mar 5, 2026 | Facilities Management, Sinsheimer Building

LOCATION: Sinsheimer Labs – Restrooms, all floors UTILITY TO BE SHUT DOWN: Domestic Water (Cold and Hot) to Restrooms SCHEDULED DATE: Tuesday, March 10, 2026 (add this to your calendar) SCHEDULED TIME: 8:00 AM to 12:00 PM  REASON: Replacing angle stops in the...

SINS – WORK ADVISORY – DUCT CLEANING – 03/16/26

Mar 3, 2026 | Facilities Management, Sinsheimer Building

LOCATION: Sinsheimer Labs – Loading Dock and Labs 312, 312A/B, 313, & 314 WORK BEING PERFORMED: Duct cleaning in Sinsheimer 312, 312A/B, 313, & 314, cleaning hoses will come through Sinsheimer Loading Dock up through the windows. A service vehicle will...

SINS – UTILITY SHUTDOWN – ATRIUM VENTILATION – 02/26/26

Feb 23, 2026 | Facilities Management, Sinsheimer Building

LOCATION(S): Sinsheimer Laboratories – Central Atrium Area, including offices UTILITY THAT WILL BE SHUT DOWN: Center General Exhaust – Exhaust Fan EF-10 The work requiring this Utility Shutdown directly supports the ongoing Sinsheimer HVAC & Mechanical...

SINS – WORK ADVISORY – BREAKROOM RENOVATION – 02/14 – 02/27/26

Feb 10, 2026 | Facilities Management, Sinsheimer Building

LOCATION: Sinsheimer Laboratories – Room 352 (Breakroom) WORK TO BE COMPLETED: Demolition/Renovation of Sinsheimer 352 SCHEDULED DATE: Saturday, February 14 to Friday, February 27, 2026 (add this to your calendar) SCHEDULED TIME: All times during scheduled dates...

SINS – UTILITY SHUTDOWN – DOMESTIC COLD WATER – 02/10/26

Feb 4, 2026 | Facilities Management, Sinsheimer Building

LOCATION: Sinsheimer Labs: Restrooms, all floors UTILITY TO BE SHUT DOWN: Domestic Cold Water to restrooms SCHEDULED DATE: Tuesday, February 4, 2026 (add this to your calendar) SCHEDULED TIME: 7:00 AM to 12:00 PM  REASON: Replacing hose bibbs in the renovated third...

MULTIPLE BUILDINGS  – UTILITY TESTING – FIRE DOORS – 02/17 – 02/20/26

Feb 2, 2026 | Biomedical Sciences Building, Earth & Marine Sciences Building, Facilities Management, Sinsheimer Building

LOCATION(S): BioMed – Room 201 Earth & Marine Sciences – 13 Doors Sinsheimer – Room 225 UTILITY TO BE TESTED: Accordion fire doors and fire alarm related controls **Horn will not be sounded. If you hear an alarm, respond as you would to a regular...

SINS – SHUTDOWN NOTIFICATION – FIRE SPRINKLER SYSTEM – 02/05/2026

Jan 29, 2026 | Facilities Management, Sinsheimer Building

LOCATION(S): Sinsheimer Labs – First Floor, South Wing ONLY  UTILITY TO BE SHUTDOWN: Fire Sprinklers and Sprinkler Flow Alarm *During this work, if you do hear an alarm, respond as you would to a regular fire alarm.  SCHEDULED DATE(S): Thursday, February 5, 2025...

SINS LABS – UTILITY SHUT DOWN – DEIONIZED WATER – 02/03/26

Jan 23, 2026 | Facilities Management, Sinsheimer Building

LOCATION: Sinsheimer Labs: South Wing Labs 109, 206, 309/311, and 409 UTILITY TO BE SHUT DOWN: Deionized Water SCHEDULED DATE(S): Tuesday, February 3, 2026 (add this to your calendar) SCHEDULED TIME: 7:00 AM to 12:00 PM REASON: Replacing the deionized water shut-off...
Page 1 of 812345...»Last »
Back to the Message Center

Recent messages

  • ISB – WORK ADVISORY – ROOF WORK – 03/14 & 03/23 – 03/27/26
  • SINS SOUTH LABS – UTILITY SHUTDOWN – HVAC INCLUDING FUME HOODS – 03/24 – 03/25/26
  • SINS-RESTROOMS EMERGENCY SHUTDOWN 3/10/26
  • VARIOUS BUILDINGS – UTILITY TESTING – ELEVATOR RECALL – 03/24 – 03/25/26 and 04/07 – 04/08/26
  • Open call: Simons Foundation – Pivot Fellowship
Pantheon v1.0
For Faculty & Staff | Division of Physical & Biological Sciences | About Toolkit
Site feedback

Login with CruzID