Jun 24, 2026 | Facilities Management, Sinsheimer Building
LOCATION: Sinsheimer Labs UTILITY THAT WILL BE SHUT DOWN: Process Cooling Water (PCW) SCHEDULED DATE: Wednesday, July 8, 2026 (add this to your calendar) SCHEDULED TIMES: 6:00 AM to 3:00 PM REASON: Replacement of process cooling heat exchanger. IMPACTS: Equipment...
Jun 15, 2026 | Facilities Management, Sinsheimer Building
PBSci Facilities Notification SINS – UTILITY SHUTDOWN – FREIGHT ELEVATOR – 06/15/26 LOCATION(S): Sinsheimer Labs – Freight Elevator UNSCHEDULED DATES/TIMES: 1:00 PM on Monday, June 15, 2026 to TBD DETAILS: The elevator vendor has been...
Jun 12, 2026 | Facilities Management, Sinsheimer Building
LOCATION(S): Sinsheimer Laboratories – Entire Building UTILITY THAT WILL BE SHUT DOWN: All HVAC/Ventilation Vacuum System — including Fume hoods **PLEASE ENSURE THAT FUME HOOD SASHES ARE CLOSED The work requiring this Utility Shutdown directly supports the...
Jun 4, 2026 | Facilities Management, Sinsheimer Building
LOCATION: Sinsheimer Labs: Room 304 UTILITY TO BE SHUT DOWN: Ice Machine in Sins 304 DATE AND TIME OF FAILURE: Today, Thursday, June 4, 2026 at 12:00 PM – TBD REASON: Cooling unit malfunction, repairs are underway. IMPACTS: The ice machine in Sinsheimer Labs 304...
Jun 3, 2026 | Facilities Management, Sinsheimer Building
LOCATION: Sinsheimer Labs UTILITY THAT WILL BE SHUT DOWN: Process Cooling Water (PCW) SCHEDULED DATE: Wednesday, June 17, 2026 (add this to your calendar) SCHEDULED TIMES: 6:00 AM to 3:00 PM REASON: Replacement of process cooling heat exchanger. IMPACTS: Equipment...
Jun 3, 2026 | Facilities Management, Sinsheimer Building
LOCATION(S): Sinsheimer Labs – Freight Elevator (South) UNSCHEDULED DATES/TIMES: 9:00 AM on Wednesday, June 3, 2026 to Friday, June 12, 2026 DETAILS: The freight elevator is out of service again – troubleshooting is required. We will continue to provide...
Jun 1, 2026 | Facilities Management, Sinsheimer Building
LOCATION(S): Sinsheimer Labs – Freight Elevator UNSCHEDULED DATES/TIMES: 9:00 AM on Monday, June 1, 2026 to TBD DETAILS: The issue has been reported, and we will continue to provide updates as we receive them. Please let us know if you have any...
May 21, 2026 | Facilities Management, Sinsheimer Building
5/21/2026 LOCATION(S): Sinsheimer Labs – Freight Elevator UNSCHEDULED DATES/TIMES: 9:00 AM on Thursday 5/21/2026-TBD DETAILS: The SINS freight elevator briefly returned to service this morning, but is now out of commission again. The elevator vendor is...
May 19, 2026 | Facilities Management, Sinsheimer Building
LOCATION: Sinsheimer Labs: Entire building, all floors UTILITY TO BE SHUT DOWN: Domestic Hot Water The work requiring this Utility Shutdown directly supports the ongoing Sinsheimer HVAC & Mechanical Controls Project currently underway in the SOUTH Wing Labs....
May 19, 2026 | Facilities Management, Sinsheimer Building
LOCATION: Sinsheimer Labs: Entire building, all floors UTILITY TO BE SHUT DOWN: Industrial Cold & Hot Water and Domestic Cold & Hot Water The work requiring this Utility Shutdown directly supports the ongoing Sinsheimer HVAC & Mechanical Controls Project...